Bow Front Desk with Credenza Desk and HutchThe Jade Series bow front desk and credenza desk that's shown in the picture has a scratch resistant wood veneer surface with a Chestnut Cherry finish. The credenza has two locking sets of pedestal drawers, integrated grommets and a hutch with a tack board. The set is available in different finish options and you have your choice of drawers and accessories for the desk. Cherryman guarantees this quality product with a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items:
|
Condition | New |
Brand | |
Series | |
Parts List | J822, J825, J833, J834, J426, J427, J101.GREY |
Available Finishes | Chestnut Cherry, Henna Mahogany |
Finish | Chestnut Cherry |
Material | Aluminum, Fabric, Veneer, Wood |
Shape | Bow Front |
Features | Drawers, File Cabinet, Grommets, Locking, Overhead Storage, Set, Storage, with Hutch |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | J822 | Bowfront Desk Shell 72 x 36/39 | $2525.00 | $1640.00 | $1,640.00 |
1 | J825 | Credenza Shell 72 x 20 | $1690.00 | $1100.00 | $1,100.00 |
1 | J833 | FF Ped for Credenza/Return 16 x 19 x 28 | $1149.00 | $745.00 | $745.00 |
1 | J834 | BBF Ped for Credenza/Return 16 x 19 x 28 | $1162.00 | $755.00 | $755.00 |
1 | J426 | Storage Hutch w/o Doors 72W x 42H | $2501.00 | $1625.00 | $1,625.00 |
1 | J427 | Wood Doors for Hutch 69W x 15H | $368.00 | $240.00 | $240.00 |
1 | J101.GREY | Tack Board for J426 Hutch 69W x 20H | $349.00 | $230.00 | $230.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.