Office Desk with Hutch and DrawersThis office desk with hutch is available in multiple finishes, Black Cherry shown, and has several pedestal drawer configurations of your choosing for in-desk storage. Standard storage includes an external two-door cabinet and a hutch with glass-paned overhead storage. Quality backed by a 10-year manufacturer's warranty.
Estimated Arrival - Order today and receive as soon as Thu. May. 9 - May. 23 |
Condition | New |
Brand | |
Series | |
Parts List | A521, A823, A825, A540, A426, A439 |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Black Cherry |
Dimensions | 107" x 102" x 29/59" |
Material | Aluminum, Glass, Melamine |
Shape | U Shaped |
Features | Locking, Desk, Grommets, with Drawers, with Hutch, with Storage, with Storage Cabinet, Doors, Cabinet, Credenza, Drawers, Overhead Storage, Storage |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | A521 | Rectangular Desk Shell 71 x 30 | $651.00 | $425.00 | $425.00 |
1 | A823 | Bridge 48 x 24 | $311.00 | $205.00 | $205.00 |
1 | A825 | Credenza Desk Shell 71 x 24 | $450.00 | $295.00 | $295.00 |
1 | A540 | 2 Door Storage Cabinet - 36" x 23" x 29" | $550.00 | $360.00 | $360.00 |
1 | A426 | Hutch w/o Doors 71W x 36H | $513.00 | $335.00 | $335.00 |
1 | A439 | Alum Glass Doors for 72W Hutch | $484.00 | $315.00 | $315.00 |
1 | A832 | FF Ped w/o Top 16 x 22 x 28 | $566.00 | $370.00 | $370.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.